Your Trusted B2B Sourcing Platform About | Help | Sign In | Post Request
Buying Guide

How to Use a CNC Machining Cost Per Part Calculator for International Sourcing

Why You Need a CNC Machining Cost Per Part Calculator

International sourcing of CNC-machined parts from China requires accurate cost estimation to avoid budget overruns and supplier surprises. A CNC machining cost per part calculator helps you break down quotes into material, labor, overhead, and profit, enabling apples-to-apples comparisons. This guide shows you how to use such a calculator effectively when sourcing from Chinese manufacturers, with real data from our supplier directory.

A worker sprays paint on large metal beams in an industrial warehouse. (Photo: Hoang NC / Pexels)

Key Inputs for the Calculator

1. Material Selection

Choose the exact material grade (e.g., 6061 aluminum, 4140 steel). Our directory lists suppliers offering materials like those used in Automotive Control Arm Brackets (steel) and Aluminum Rail Mounting Plates. Enter the material cost per kg (ask suppliers for current rates).

2. Tolerance and Surface Finish

Tighter tolerances increase machining time and scrap. Input the required tolerance (e.g., ±0.1 mm) and surface finish (e.g., 3.2 μm Ra). For example, Heavy-Duty Steel Locking Brackets often require tighter tolerances than Construction Steel Hinge Brackets.

3. Part Geometry and Complexity

Complex parts with multiple features (holes, threads, pockets) require more setups and tool changes. Estimate the number of operations or use a CAD-based feature count.

4. Annual Volume

Volume significantly impacts per-part cost. For low volumes (e.g., 100 units), setup time dominates; for high volumes (10,000+), per-part cost drops. Our observed unit price range of $2.8 – $12 reflects this variation.

5. Shipping and Duties

Include freight cost (air vs. sea) and import duties. For example, a $5 part shipped by sea from China to the US may add $0.50 per unit.

Step-by-Step Calculation Process

  1. Enter Material Data: Input material type, weight, and cost. Use a 20% waste factor for raw material.
  2. Estimate Machining Time: Break down operations (cutting, drilling, finishing). Typical CNC rates in China range $20–$40 per hour.
  3. Add Setup and Tooling: Include one-time setup ($50–$200) and tooling costs (amortized over volume).
  4. Apply Overhead and Profit: Chinese suppliers often add 10–20% for overhead and 10–15% profit.
  5. Calculate Per-Part Cost: Sum all costs and divide by volume. Compare with supplier quotes.
Aerial view of a large industrial facility with steel storage and warehouses. (Photo: Pexels User / Pexels)

Red Flags to Watch For

  • Unrealistically low quotes: If a quote is below your calculated raw material cost, the supplier may be using lower-grade material or hiding costs.
  • Vague material specifications: Avoid suppliers who say "aluminum" without specifying grade (e.g., 6061 vs. 7075).
  • No tolerance breakdown: A single price for all tolerances indicates potential quality issues.
  • Excessive minimum order quantities: Some Chinese suppliers demand high MOQs to hide high setup costs.

Questions to Ask Suppliers

  • What material grades do you stock, and what is your current price per kg?
  • Can you provide a breakdown of machining time, setup, and tooling costs?
  • How do you handle scrap and rework costs?
  • What is your typical lead time and shipping cost to my destination?
  • Do you offer volume discounts beyond 1000 units?

Practical Checklist for International Buyers

StepActionData Source
1Define part specifications (material, tolerance, finish)Engineering drawings
2Use a CNC machining cost per part calculator with your inputsOnline tool or spreadsheet
3Request quotes from 3-5 verified Chinese suppliersOur supplier directory (1 verified supplier, 4 products)
4Compare calculated costs vs. quoted pricesCalculator output
5Negotiate based on volume and material savingsSupplier feedback
6Confirm lead times and shipping termsSupplier contract

Real-World Example: Automotive Control Arm Bracket

Using our directory, an Automotive Control Arm Bracket (steel, 0.5 kg, ±0.2 mm tolerance) was quoted at $8.50 per part for 500 units. Our calculator estimated raw material ($1.20), machining time (0.5 hr at $30/hr = $15), setup ($100/500 = $0.20), overhead (20% = $3.28), and profit (10% = $1.97), totaling $21.65. The quote was lower, indicating the supplier likely used a more efficient process or lower overhead. We verified the supplier's quality through samples.

FAQs

Q: How accurate is a CNC machining cost per part calculator for Chinese suppliers?

A: Accuracy depends on input data. With precise material costs, machining rates, and volume, calculators can estimate within ±15% of actual quotes. Use supplier-provided rates when possible.

Q: Can I use the calculator for prototypes vs. production?

A: Yes, but adjust for higher setup costs (no amortization) and lower material waste. Prototype quotes often include a "learning curve" premium.

Q: What if the calculator shows a higher cost than the supplier quote?

A: Investigate. The supplier may be using lower-grade material, less stringent tolerances, or subsidizing setup. Request a detailed breakdown to ensure quality isn't compromised.

Ready to source from verified suppliers? Get free quotes and compare offers within 24 hours.

Frequently Asked Questions

How accurate is a CNC machining cost per part calculator for Chinese suppliers?

Accuracy depends on input data. With precise material costs, machining rates, and volume, calculators can estimate within ±15% of actual quotes. Use supplier-provided rates when possible.

Can I use the calculator for prototypes vs. production?

Yes, but adjust for higher setup costs (no amortization) and lower material waste. Prototype quotes often include a 'learning curve' premium.

What if the calculator shows a higher cost than the supplier quote?

Investigate. The supplier may be using lower-grade material, less stringent tolerances, or subsidizing setup. Request a detailed breakdown to ensure quality isn't compromised.

Ready to Get Your CNC Parts Made in China

Get matched with verified suppliers who can meet your exact specifications.

Get Free Quotes
基本 文件 流程 错误 SQL 调试
  1. 请求信息 : 2026-08-12 16:23:19 HTTP/2.0 GET : https://cnc-parts-china.com/guides/how-to-use-a-cnc-machining-cost-per-part-calculator-for-international-sourcing
  2. 运行时间 : 0.103918s [ 吞吐率:9.62req/s ] 内存消耗:5,214.05kb 文件加载:153
  3. 缓存信息 : 0 reads,0 writes
  4. 会话信息 : SESSION_ID=a86cd164cb5bdfc2e9321789cbb345fa
  1. /www/wwwroot/www.cnc-parts-china.com/public/index.php ( 0.79 KB )
  2. /www/wwwroot/www.cnc-parts-china.com/vendor/autoload.php ( 0.75 KB )
  3. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/autoload_real.php ( 1.63 KB )
  4. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/platform_check.php ( 0.90 KB )
  5. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/ClassLoader.php ( 15.99 KB )
  6. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/autoload_static.php ( 6.03 KB )
  7. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper.php ( 8.34 KB )
  8. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-validate/src/helper.php ( 2.19 KB )
  9. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/helper.php ( 1.47 KB )
  10. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/stubs/load_stubs.php ( 0.16 KB )
  11. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Exception.php ( 1.69 KB )
  12. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-container/src/Facade.php ( 2.71 KB )
  13. /www/wwwroot/www.cnc-parts-china.com/vendor/ralouphie/getallheaders/src/getallheaders.php ( 1.60 KB )
  14. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/polyfill-mbstring/bootstrap.php ( 8.26 KB )
  15. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/polyfill-mbstring/bootstrap80.php ( 9.78 KB )
  16. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/var-dumper/Resources/functions/dump.php ( 0.99 KB )
  17. /www/wwwroot/www.cnc-parts-china.com/vendor/ezyang/htmlpurifier/library/HTMLPurifier.composer.php ( 0.10 KB )
  18. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-dumper/src/helper.php ( 0.18 KB )
  19. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/var-dumper/VarDumper.php ( 3.73 KB )
  20. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/App.php ( 15.30 KB )
  21. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-container/src/Container.php ( 15.76 KB )
  22. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/container/src/ContainerInterface.php ( 1.02 KB )
  23. /www/wwwroot/www.cnc-parts-china.com/app/provider.php ( 0.19 KB )
  24. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Http.php ( 6.22 KB )
  25. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper/Str.php ( 7.29 KB )
  26. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Env.php ( 4.68 KB )
  27. /www/wwwroot/www.cnc-parts-china.com/app/common.php ( 0.90 KB )
  28. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/helper.php ( 18.77 KB )
  29. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Config.php ( 5.93 KB )
  30. /www/wwwroot/www.cnc-parts-china.com/config/app.php ( 0.95 KB )
  31. /www/wwwroot/www.cnc-parts-china.com/config/cache.php ( 0.78 KB )
  32. /www/wwwroot/www.cnc-parts-china.com/config/console.php ( 1.07 KB )
  33. /www/wwwroot/www.cnc-parts-china.com/config/cookie.php ( 0.56 KB )
  34. /www/wwwroot/www.cnc-parts-china.com/config/database.php ( 2.13 KB )
  35. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Env.php ( 1.67 KB )
  36. /www/wwwroot/www.cnc-parts-china.com/config/filesystem.php ( 0.61 KB )
  37. /www/wwwroot/www.cnc-parts-china.com/config/lang.php ( 0.91 KB )
  38. /www/wwwroot/www.cnc-parts-china.com/config/log.php ( 1.35 KB )
  39. /www/wwwroot/www.cnc-parts-china.com/config/middleware.php ( 0.19 KB )
  40. /www/wwwroot/www.cnc-parts-china.com/config/route.php ( 2.27 KB )
  41. /www/wwwroot/www.cnc-parts-china.com/config/session.php ( 0.69 KB )
  42. /www/wwwroot/www.cnc-parts-china.com/config/trace.php ( 0.34 KB )
  43. /www/wwwroot/www.cnc-parts-china.com/config/view.php ( 0.82 KB )
  44. /www/wwwroot/www.cnc-parts-china.com/app/event.php ( 0.25 KB )
  45. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Event.php ( 7.77 KB )
  46. /www/wwwroot/www.cnc-parts-china.com/app/service.php ( 0.13 KB )
  47. /www/wwwroot/www.cnc-parts-china.com/app/AppService.php ( 0.26 KB )
  48. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Service.php ( 1.64 KB )
  49. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Lang.php ( 7.35 KB )
  50. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/lang/zh-cn.php ( 13.70 KB )
  51. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/Error.php ( 3.31 KB )
  52. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/RegisterService.php ( 1.33 KB )
  53. /www/wwwroot/www.cnc-parts-china.com/vendor/services.php ( 0.15 KB )
  54. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/PaginatorService.php ( 1.52 KB )
  55. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/ValidateService.php ( 0.99 KB )
  56. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/ModelService.php ( 2.04 KB )
  57. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/Service.php ( 0.77 KB )
  58. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Middleware.php ( 6.72 KB )
  59. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/BootService.php ( 0.77 KB )
  60. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/Paginator.php ( 11.86 KB )
  61. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-validate/src/Validate.php ( 63.20 KB )
  62. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/Model.php ( 23.55 KB )
  63. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/contract/Arrayable.php ( 0.09 KB )
  64. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/contract/Jsonable.php ( 0.13 KB )
  65. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/contract/Modelable.php ( 0.09 KB )
  66. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/Attribute.php ( 21.05 KB )
  67. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/AutoWriteData.php ( 4.20 KB )
  68. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/Conversion.php ( 6.75 KB )
  69. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/DbConnect.php ( 5.16 KB )
  70. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/ModelEvent.php ( 2.33 KB )
  71. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/RelationShip.php ( 28.30 KB )
  72. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Db.php ( 2.88 KB )
  73. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/DbManager.php ( 8.52 KB )
  74. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Log.php ( 6.28 KB )
  75. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Manager.php ( 3.92 KB )
  76. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/log/src/LoggerInterface.php ( 2.71 KB )
  77. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/log/src/LoggerTrait.php ( 2.69 KB )
  78. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Cache.php ( 4.92 KB )
  79. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/simple-cache/src/CacheInterface.php ( 4.71 KB )
  80. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper/Arr.php ( 17.45 KB )
  81. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/cache/driver/File.php ( 7.84 KB )
  82. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/cache/Driver.php ( 9.02 KB )
  83. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/CacheHandlerInterface.php ( 1.99 KB )
  84. /www/wwwroot/www.cnc-parts-china.com/app/Request.php ( 0.09 KB )
  85. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Request.php ( 54.64 KB )
  86. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/UrlHandler.php ( 6.05 KB )
  87. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/DomainHandler.php ( 5.49 KB )
  88. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/HttpMethodHandler.php ( 4.74 KB )
  89. /www/wwwroot/www.cnc-parts-china.com/app/middleware.php ( 0.30 KB )
  90. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Pipeline.php ( 2.61 KB )
  91. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/TraceDebug.php ( 3.40 KB )
  92. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/middleware/SessionInit.php ( 1.94 KB )
  93. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Session.php ( 1.80 KB )
  94. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/session/driver/File.php ( 6.27 KB )
  95. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/SessionHandlerInterface.php ( 0.87 KB )
  96. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/session/Store.php ( 7.12 KB )
  97. /www/wwwroot/www.cnc-parts-china.com/app/middleware/InstallCheck.php ( 0.82 KB )
  98. /www/wwwroot/www.cnc-parts-china.com/app/middleware/Maintenance.php ( 1.64 KB )
  99. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/facade/Db.php ( 0.93 KB )
  100. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/connector/Mysql.php ( 5.73 KB )
  101. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/PDOConnection.php ( 53.74 KB )
  102. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Connection.php ( 8.39 KB )
  103. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/ConnectionInterface.php ( 4.57 KB )
  104. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/builder/Mysql.php ( 16.58 KB )
  105. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Builder.php ( 24.07 KB )
  106. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/BaseBuilder.php ( 27.50 KB )
  107. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Query.php ( 15.97 KB )
  108. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/BaseQuery.php ( 45.13 KB )
  109. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/TimeFieldQuery.php ( 7.43 KB )
  110. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/AggregateQuery.php ( 3.26 KB )
  111. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ModelRelationQuery.php ( 20.07 KB )
  112. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ParamsBind.php ( 3.66 KB )
  113. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ResultOperation.php ( 7.01 KB )
  114. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/WhereQuery.php ( 19.37 KB )
  115. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/JoinAndViewQuery.php ( 7.11 KB )
  116. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/TableFieldInfo.php ( 2.63 KB )
  117. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/Transaction.php ( 2.77 KB )
  118. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/log/driver/File.php ( 6.10 KB )
  119. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/LogHandlerInterface.php ( 0.86 KB )
  120. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/log/Channel.php ( 3.89 KB )
  121. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/event/LogRecord.php ( 1.02 KB )
  122. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Route.php ( 23.73 KB )
  123. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleName.php ( 5.74 KB )
  124. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Domain.php ( 2.53 KB )
  125. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleGroup.php ( 22.41 KB )
  126. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Rule.php ( 27.49 KB )
  127. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleItem.php ( 9.78 KB )
  128. /www/wwwroot/www.cnc-parts-china.com/route/admin.php ( 11.49 KB )
  129. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Route.php ( 4.70 KB )
  130. /www/wwwroot/www.cnc-parts-china.com/route/app.php ( 3.73 KB )
  131. /www/wwwroot/www.cnc-parts-china.com/route/install.php ( 0.59 KB )
  132. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/dispatch/Controller.php ( 4.74 KB )
  133. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Dispatch.php ( 11.32 KB )
  134. /www/wwwroot/www.cnc-parts-china.com/app/controller/content/Guide.php ( 1.71 KB )
  135. /www/wwwroot/www.cnc-parts-china.com/app/controller/front/BaseFrontController.php ( 70.19 KB )
  136. /www/wwwroot/www.cnc-parts-china.com/app/BaseController.php ( 6.06 KB )
  137. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/View.php ( 1.70 KB )
  138. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Config.php ( 1.37 KB )
  139. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/View.php ( 4.39 KB )
  140. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Session.php ( 1.79 KB )
  141. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/Collection.php ( 16.47 KB )
  142. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Express.php ( 1.53 KB )
  143. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Raw.php ( 1.30 KB )
  144. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Response.php ( 9.07 KB )
  145. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/response/View.php ( 3.29 KB )
  146. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Cookie.php ( 6.06 KB )
  147. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-view/src/Think.php ( 8.38 KB )
  148. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/TemplateHandlerInterface.php ( 1.60 KB )
  149. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/Template.php ( 46.61 KB )
  150. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/template/driver/File.php ( 2.41 KB )
  151. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/template/contract/DriverInterface.php ( 0.86 KB )
  152. /www/wwwroot/www.cnc-parts-china.com/runtime/temp/7ca10c289ae36b7629e662dcf2e3aff0.php ( 14.04 KB )
  153. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/Html.php ( 4.42 KB )
  1. CONNECT:[ UseTime:0.000671s ] mysql:host=127.0.0.1;port=3306;dbname=cncpartsch;charset=utf8mb4
  2. SHOW FULL COLUMNS FROM `kt_system_config` [ RunTime:0.001361s ]
  3. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'maintenance_mode' LIMIT 1 [ RunTime:0.000552s ]
  4. SHOW TABLES LIKE 'kt_site' [ RunTime:0.001579s ]
  5. SHOW FULL COLUMNS FROM `kt_site` [ RunTime:0.001764s ]
  6. SELECT `favicon` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000582s ]
  7. SHOW TABLES LIKE 'kt_system_config' [ RunTime:0.001453s ]
  8. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'site_favicon' LIMIT 1 [ RunTime:0.000515s ]
  9. SELECT `logo` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000393s ]
  10. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'site_logo' LIMIT 1 [ RunTime:0.000285s ]
  11. SELECT `name` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000236s ]
  12. SELECT * FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000447s ]
  13. SELECT `config_value`,`config_key` FROM `kt_system_config` WHERE `config_key` IN ('site_name','site_domain','site_subtitle','site_description','site_logo','site_favicon','site_keywords','seo_home_title','seo_home_description','seo_home_keywords','contact_phone','contact_wechat','icp_code') [ RunTime:0.000393s ]
  14. SHOW FULL COLUMNS FROM `kt_category` [ RunTime:0.001437s ]
  15. SHOW COLUMNS FROM `kt_category` [ RunTime:0.001208s ]
  16. SELECT * FROM `kt_category` WHERE `parent_id` = 0 AND `site_id` = 1 AND `status` = 1 ORDER BY `sort` DESC,`id` ASC LIMIT 5 [ RunTime:0.000652s ]
  17. SHOW FULL COLUMNS FROM `kt_news` [ RunTime:0.001589s ]
  18. SELECT * FROM `kt_news` WHERE `site_id` = 1 AND `slug` = 'how-to-use-a-cnc-machining-cost-per-part-calculator-for-international-sourcing' AND `content_type` = 'buying_guide' AND `publish_status` = 'published' LIMIT 1 [ RunTime:0.000750s ]
  19. UPDATE `kt_news` SET `views` = `views` + 1 WHERE `id` = 157 [ RunTime:0.002775s ]
  20. SHOW FULL COLUMNS FROM `kt_news_data` [ RunTime:0.001342s ]
  21. SELECT * FROM `kt_news_data` WHERE `news_id` = 157 LIMIT 1 [ RunTime:0.000453s ]
  22. SELECT * FROM `kt_news` WHERE `site_id` = 1 AND `publish_status` = 'published' AND `category_id` = 80 AND `id` <> 157 AND `content_type` IN ('article','buying_guide','comparison','case_study') ORDER BY content_type = 'buying_guide' DESC,`id` DESC LIMIT 8 [ RunTime:0.001241s ]
0.111973s