Your Trusted B2B Sourcing Platform About | Help | Sign In | Post Request
Buying Guide

How to Calculate CNC Machining Cost Per Part: A Data-Driven Guide for International Buyers

Understanding the True Cost of CNC Machining

When sourcing CNC machined parts from China, international buyers often focus solely on the unit price. However, the cnc machining cost per part calculator must account for multiple variables: machine time, material waste, setup fees, and volume breaks. In our directory, we list 1 verified supplier and 4 products (Automotive Control Arm Bracket, Construction Steel Hinge Bracket, Aluminum Rail Mounting Plate, Heavy-Duty Steel Locking Bracket) with unit prices ranging from $2.8 to $12. This guide provides a data-driven framework to calculate and negotiate the best cost per part.

Detailed view of machinery in an operational glass factory in Dar es Salaam. (Photo: Keegan Checks / Pexels)

Key Components of CNC Machining Cost Per Part

1. Machine Time Cost

Machine time is the largest cost driver. It includes cutting time, rapid traverse, and tool changes. Typical hourly rates for CNC mills in China range from $30 to $60. For example, a part requiring 15 minutes of machining at $40/hour costs $10 in machine time.

2. Material Cost and Waste

Material cost is calculated as (part volume + scrap volume) × material price per unit. Scrap can be 10-30% for complex parts. For the Aluminum Rail Mounting Plate (a common product), using 6061 aluminum at $4/kg, a 0.5 kg part with 20% waste costs $2.40.

3. Setup and Tooling Fees

Setup fees cover programming, fixturing, and first-article inspection. For low volumes, setup can dominate cost. A typical setup fee in China is $50-$200 per job. For a 10-part order with $100 setup, add $10 per part.

4. Volume Breaks

Higher volumes reduce per-part setup and tooling costs. Our supplier directory shows that for the Automotive Control Arm Bracket, the unit price drops from $12 for 50 units to $8 for 500 units—a 33% reduction.

How to Build Your Own CNC Machining Cost Per Part Calculator

Use this formula: Cost Per Part = (Machine Time × Hourly Rate) + (Material Cost × (1 + Waste%)) + (Setup Fee / Quantity) + (Tooling Cost / Quantity) + Logistics. Below is a practical template.

ComponentExample ValueCalculation
Machine Time12 min12/60 × $40 = $8
Material0.4 kg × $5/kg$2.00
Waste (15%)15% of material$0.30
Setup Fee$80$80/100 parts = $0.80
Tooling$40$40/1000 parts = $0.04
Total per part$11.14

For the Heavy-Duty Steel Locking Bracket, a similar calculation yields $9.50 per part for 200 units.

A welder skillfully works on a massive metal structure in an industrial setting. (Photo: Bornil Sarker / Pexels)

Red Flags and Questions to Ask Suppliers

Red Flags

  • Quotes without breakdown of machine time and material.
  • Extremely low prices (< $2) for complex parts—likely underestimating costs.
  • No mention of setup fees or volume breaks.

Questions to Ask

  1. What is your hourly CNC machine rate? (Expect $30-$60)
  2. What is your typical scrap percentage for this material?
  3. Are setup fees included in the unit price or charged separately?
  4. What are the volume break points for pricing?

Practical Checklist for International Buyers

  • ☐ Request a detailed quote with machine time, material cost, and setup fees.
  • ☐ Use the cnc machining cost per part calculator framework to validate the quote.
  • ☐ Ask about material sourcing—Chinese suppliers often have better rates for domestic materials.
  • ☐ Inquire about tooling life and whether it's included.
  • ☐ Negotiate volume breaks at 100, 500, and 1000 units.

FAQ

Q: What is the average CNC machining cost per part for simple brackets?
A: Based on our directory, simple brackets like the Construction Steel Hinge Bracket range from $2.8 to $5 for low volumes (50-100 parts).

Q: How can I reduce setup costs?
A: Combine multiple parts into one order to share setup fees, or choose a supplier that offers free setup for high-volume orders.

Q: Is the cnc machining cost per part calculator accurate for Chinese suppliers?
A: Yes, when using local hourly rates ($30-$60) and material costs, it aligns well with quotes from verified suppliers in our directory.

Ready to source from verified suppliers? Get free quotes and compare offers within 24 hours.

Frequently Asked Questions

What is the average CNC machining cost per part for simple brackets?

Based on our directory, simple brackets like the Construction Steel Hinge Bracket range from $2.8 to $5 for low volumes (50-100 parts).

How can I reduce setup costs?

Combine multiple parts into one order to share setup fees, or choose a supplier that offers free setup for high-volume orders.

Is the cnc machining cost per part calculator accurate for Chinese suppliers?

Yes, when using local hourly rates ($30-$60) and material costs, it aligns well with quotes from verified suppliers in our directory.

Ready to Get Your CNC Parts Made in China

Get matched with verified suppliers who can meet your exact specifications.

Get Free Quotes
基本 文件 流程 错误 SQL 调试
  1. 请求信息 : 2026-08-12 16:23:17 HTTP/2.0 GET : https://cnc-parts-china.com/guides/how-to-calculate-cnc-machining-cost-per-part-a-data-driven-guide-for-international-buyers
  2. 运行时间 : 0.205501s [ 吞吐率:4.87req/s ] 内存消耗:5,209.86kb 文件加载:153
  3. 缓存信息 : 0 reads,0 writes
  4. 会话信息 : SESSION_ID=a65a2935390c015b162735a178815f5d
  1. /www/wwwroot/www.cnc-parts-china.com/public/index.php ( 0.79 KB )
  2. /www/wwwroot/www.cnc-parts-china.com/vendor/autoload.php ( 0.75 KB )
  3. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/autoload_real.php ( 1.63 KB )
  4. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/platform_check.php ( 0.90 KB )
  5. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/ClassLoader.php ( 15.99 KB )
  6. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/autoload_static.php ( 6.03 KB )
  7. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper.php ( 8.34 KB )
  8. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-validate/src/helper.php ( 2.19 KB )
  9. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/helper.php ( 1.47 KB )
  10. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/stubs/load_stubs.php ( 0.16 KB )
  11. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Exception.php ( 1.69 KB )
  12. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-container/src/Facade.php ( 2.71 KB )
  13. /www/wwwroot/www.cnc-parts-china.com/vendor/ralouphie/getallheaders/src/getallheaders.php ( 1.60 KB )
  14. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/polyfill-mbstring/bootstrap.php ( 8.26 KB )
  15. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/polyfill-mbstring/bootstrap80.php ( 9.78 KB )
  16. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/var-dumper/Resources/functions/dump.php ( 0.99 KB )
  17. /www/wwwroot/www.cnc-parts-china.com/vendor/ezyang/htmlpurifier/library/HTMLPurifier.composer.php ( 0.10 KB )
  18. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-dumper/src/helper.php ( 0.18 KB )
  19. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/var-dumper/VarDumper.php ( 3.73 KB )
  20. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/App.php ( 15.30 KB )
  21. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-container/src/Container.php ( 15.76 KB )
  22. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/container/src/ContainerInterface.php ( 1.02 KB )
  23. /www/wwwroot/www.cnc-parts-china.com/app/provider.php ( 0.19 KB )
  24. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Http.php ( 6.22 KB )
  25. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper/Str.php ( 7.29 KB )
  26. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Env.php ( 4.68 KB )
  27. /www/wwwroot/www.cnc-parts-china.com/app/common.php ( 0.90 KB )
  28. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/helper.php ( 18.77 KB )
  29. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Config.php ( 5.93 KB )
  30. /www/wwwroot/www.cnc-parts-china.com/config/app.php ( 0.95 KB )
  31. /www/wwwroot/www.cnc-parts-china.com/config/cache.php ( 0.78 KB )
  32. /www/wwwroot/www.cnc-parts-china.com/config/console.php ( 1.07 KB )
  33. /www/wwwroot/www.cnc-parts-china.com/config/cookie.php ( 0.56 KB )
  34. /www/wwwroot/www.cnc-parts-china.com/config/database.php ( 2.13 KB )
  35. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Env.php ( 1.67 KB )
  36. /www/wwwroot/www.cnc-parts-china.com/config/filesystem.php ( 0.61 KB )
  37. /www/wwwroot/www.cnc-parts-china.com/config/lang.php ( 0.91 KB )
  38. /www/wwwroot/www.cnc-parts-china.com/config/log.php ( 1.35 KB )
  39. /www/wwwroot/www.cnc-parts-china.com/config/middleware.php ( 0.19 KB )
  40. /www/wwwroot/www.cnc-parts-china.com/config/route.php ( 2.27 KB )
  41. /www/wwwroot/www.cnc-parts-china.com/config/session.php ( 0.69 KB )
  42. /www/wwwroot/www.cnc-parts-china.com/config/trace.php ( 0.34 KB )
  43. /www/wwwroot/www.cnc-parts-china.com/config/view.php ( 0.82 KB )
  44. /www/wwwroot/www.cnc-parts-china.com/app/event.php ( 0.25 KB )
  45. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Event.php ( 7.77 KB )
  46. /www/wwwroot/www.cnc-parts-china.com/app/service.php ( 0.13 KB )
  47. /www/wwwroot/www.cnc-parts-china.com/app/AppService.php ( 0.26 KB )
  48. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Service.php ( 1.64 KB )
  49. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Lang.php ( 7.35 KB )
  50. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/lang/zh-cn.php ( 13.70 KB )
  51. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/Error.php ( 3.31 KB )
  52. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/RegisterService.php ( 1.33 KB )
  53. /www/wwwroot/www.cnc-parts-china.com/vendor/services.php ( 0.15 KB )
  54. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/PaginatorService.php ( 1.52 KB )
  55. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/ValidateService.php ( 0.99 KB )
  56. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/ModelService.php ( 2.04 KB )
  57. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/Service.php ( 0.77 KB )
  58. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Middleware.php ( 6.72 KB )
  59. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/BootService.php ( 0.77 KB )
  60. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/Paginator.php ( 11.86 KB )
  61. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-validate/src/Validate.php ( 63.20 KB )
  62. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/Model.php ( 23.55 KB )
  63. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/contract/Arrayable.php ( 0.09 KB )
  64. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/contract/Jsonable.php ( 0.13 KB )
  65. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/contract/Modelable.php ( 0.09 KB )
  66. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/Attribute.php ( 21.05 KB )
  67. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/AutoWriteData.php ( 4.20 KB )
  68. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/Conversion.php ( 6.75 KB )
  69. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/DbConnect.php ( 5.16 KB )
  70. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/ModelEvent.php ( 2.33 KB )
  71. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/RelationShip.php ( 28.30 KB )
  72. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Db.php ( 2.88 KB )
  73. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/DbManager.php ( 8.52 KB )
  74. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Log.php ( 6.28 KB )
  75. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Manager.php ( 3.92 KB )
  76. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/log/src/LoggerInterface.php ( 2.71 KB )
  77. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/log/src/LoggerTrait.php ( 2.69 KB )
  78. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Cache.php ( 4.92 KB )
  79. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/simple-cache/src/CacheInterface.php ( 4.71 KB )
  80. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper/Arr.php ( 17.45 KB )
  81. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/cache/driver/File.php ( 7.84 KB )
  82. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/cache/Driver.php ( 9.02 KB )
  83. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/CacheHandlerInterface.php ( 1.99 KB )
  84. /www/wwwroot/www.cnc-parts-china.com/app/Request.php ( 0.09 KB )
  85. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Request.php ( 54.64 KB )
  86. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/UrlHandler.php ( 6.05 KB )
  87. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/DomainHandler.php ( 5.49 KB )
  88. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/HttpMethodHandler.php ( 4.74 KB )
  89. /www/wwwroot/www.cnc-parts-china.com/app/middleware.php ( 0.30 KB )
  90. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Pipeline.php ( 2.61 KB )
  91. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/TraceDebug.php ( 3.40 KB )
  92. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/middleware/SessionInit.php ( 1.94 KB )
  93. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Session.php ( 1.80 KB )
  94. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/session/driver/File.php ( 6.27 KB )
  95. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/SessionHandlerInterface.php ( 0.87 KB )
  96. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/session/Store.php ( 7.12 KB )
  97. /www/wwwroot/www.cnc-parts-china.com/app/middleware/InstallCheck.php ( 0.82 KB )
  98. /www/wwwroot/www.cnc-parts-china.com/app/middleware/Maintenance.php ( 1.64 KB )
  99. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/facade/Db.php ( 0.93 KB )
  100. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/connector/Mysql.php ( 5.73 KB )
  101. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/PDOConnection.php ( 53.74 KB )
  102. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Connection.php ( 8.39 KB )
  103. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/ConnectionInterface.php ( 4.57 KB )
  104. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/builder/Mysql.php ( 16.58 KB )
  105. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Builder.php ( 24.07 KB )
  106. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/BaseBuilder.php ( 27.50 KB )
  107. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Query.php ( 15.97 KB )
  108. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/BaseQuery.php ( 45.13 KB )
  109. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/TimeFieldQuery.php ( 7.43 KB )
  110. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/AggregateQuery.php ( 3.26 KB )
  111. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ModelRelationQuery.php ( 20.07 KB )
  112. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ParamsBind.php ( 3.66 KB )
  113. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ResultOperation.php ( 7.01 KB )
  114. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/WhereQuery.php ( 19.37 KB )
  115. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/JoinAndViewQuery.php ( 7.11 KB )
  116. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/TableFieldInfo.php ( 2.63 KB )
  117. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/Transaction.php ( 2.77 KB )
  118. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/log/driver/File.php ( 6.10 KB )
  119. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/LogHandlerInterface.php ( 0.86 KB )
  120. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/log/Channel.php ( 3.89 KB )
  121. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/event/LogRecord.php ( 1.02 KB )
  122. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Route.php ( 23.73 KB )
  123. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleName.php ( 5.74 KB )
  124. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Domain.php ( 2.53 KB )
  125. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleGroup.php ( 22.41 KB )
  126. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Rule.php ( 27.49 KB )
  127. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleItem.php ( 9.78 KB )
  128. /www/wwwroot/www.cnc-parts-china.com/route/admin.php ( 11.49 KB )
  129. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Route.php ( 4.70 KB )
  130. /www/wwwroot/www.cnc-parts-china.com/route/app.php ( 3.73 KB )
  131. /www/wwwroot/www.cnc-parts-china.com/route/install.php ( 0.59 KB )
  132. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/dispatch/Controller.php ( 4.74 KB )
  133. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Dispatch.php ( 11.32 KB )
  134. /www/wwwroot/www.cnc-parts-china.com/app/controller/content/Guide.php ( 1.71 KB )
  135. /www/wwwroot/www.cnc-parts-china.com/app/controller/front/BaseFrontController.php ( 70.19 KB )
  136. /www/wwwroot/www.cnc-parts-china.com/app/BaseController.php ( 6.06 KB )
  137. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/View.php ( 1.70 KB )
  138. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Config.php ( 1.37 KB )
  139. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/View.php ( 4.39 KB )
  140. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Session.php ( 1.79 KB )
  141. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/Collection.php ( 16.47 KB )
  142. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Express.php ( 1.53 KB )
  143. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Raw.php ( 1.30 KB )
  144. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Response.php ( 9.07 KB )
  145. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/response/View.php ( 3.29 KB )
  146. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Cookie.php ( 6.06 KB )
  147. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-view/src/Think.php ( 8.38 KB )
  148. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/TemplateHandlerInterface.php ( 1.60 KB )
  149. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/Template.php ( 46.61 KB )
  150. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/template/driver/File.php ( 2.41 KB )
  151. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/template/contract/DriverInterface.php ( 0.86 KB )
  152. /www/wwwroot/www.cnc-parts-china.com/runtime/temp/7ca10c289ae36b7629e662dcf2e3aff0.php ( 14.04 KB )
  153. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/Html.php ( 4.42 KB )
  1. CONNECT:[ UseTime:0.015735s ] mysql:host=127.0.0.1;port=3306;dbname=cncpartsch;charset=utf8mb4
  2. SHOW FULL COLUMNS FROM `kt_system_config` [ RunTime:0.001403s ]
  3. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'maintenance_mode' LIMIT 1 [ RunTime:0.000440s ]
  4. SHOW TABLES LIKE 'kt_site' [ RunTime:0.005553s ]
  5. SHOW FULL COLUMNS FROM `kt_site` [ RunTime:0.001810s ]
  6. SELECT `favicon` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000539s ]
  7. SHOW TABLES LIKE 'kt_system_config' [ RunTime:0.000951s ]
  8. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'site_favicon' LIMIT 1 [ RunTime:0.000343s ]
  9. SELECT `logo` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000365s ]
  10. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'site_logo' LIMIT 1 [ RunTime:0.000223s ]
  11. SELECT `name` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.003331s ]
  12. SELECT * FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.002038s ]
  13. SELECT `config_value`,`config_key` FROM `kt_system_config` WHERE `config_key` IN ('site_name','site_domain','site_subtitle','site_description','site_logo','site_favicon','site_keywords','seo_home_title','seo_home_description','seo_home_keywords','contact_phone','contact_wechat','icp_code') [ RunTime:0.001857s ]
  14. SHOW FULL COLUMNS FROM `kt_category` [ RunTime:0.001278s ]
  15. SHOW COLUMNS FROM `kt_category` [ RunTime:0.001632s ]
  16. SELECT * FROM `kt_category` WHERE `parent_id` = 0 AND `site_id` = 1 AND `status` = 1 ORDER BY `sort` DESC,`id` ASC LIMIT 5 [ RunTime:0.001235s ]
  17. SHOW FULL COLUMNS FROM `kt_news` [ RunTime:0.005879s ]
  18. SELECT * FROM `kt_news` WHERE `site_id` = 1 AND `slug` = 'how-to-calculate-cnc-machining-cost-per-part-a-data-driven-guide-for-international-buyers' AND `content_type` = 'buying_guide' AND `publish_status` = 'published' LIMIT 1 [ RunTime:0.004105s ]
  19. UPDATE `kt_news` SET `views` = `views` + 1 WHERE `id` = 154 [ RunTime:0.003723s ]
  20. SHOW FULL COLUMNS FROM `kt_news_data` [ RunTime:0.001191s ]
  21. SELECT * FROM `kt_news_data` WHERE `news_id` = 154 LIMIT 1 [ RunTime:0.000566s ]
  22. SELECT * FROM `kt_news` WHERE `site_id` = 1 AND `publish_status` = 'published' AND `category_id` = 80 AND `id` <> 154 AND `content_type` IN ('article','buying_guide','comparison','case_study') ORDER BY content_type = 'buying_guide' DESC,`id` DESC LIMIT 8 [ RunTime:0.000982s ]
0.213995s