Your Trusted B2B Sourcing Platform About | Help | Sign In | Post Request
Buying Guide

How to Calculate CNC Machining Cost Per Part: A Buyer's Guide to Accurate Quoting

Understanding CNC Machining Cost Per Part

Accurately estimating the cnc machining cost per part calculator is essential for engineers and procurement professionals evaluating Chinese manufacturers. This guide breaks down the key cost drivers—material, setup, labor, and overhead—and provides a step-by-step methodology to compare supplier quotes effectively. Our directory currently lists 1 verified supplier and 4 products in this category, with unit prices ranging from $2.8 to $12 for parts like Automotive Control Arm Bracket, Construction Steel Hinge Bracket, Aluminum Rail Mounting Plate, and Heavy-Duty Steel Locking Bracket.

Worker wearing safety gear welds metal beam, emitting sparks in a factory setting. (Photo: Collab Media / Pexels)

Key Cost Components

1. Material Cost

Raw material prices fluctuate based on type, grade, and quantity. For example, aluminum (6061) costs roughly $3–$5 per kg, while steel (1018) is $1–$2 per kg. Use a cnc machining cost per part calculator to factor in material utilization (typically 20–40% for complex parts).

2. Setup Cost

Setup includes programming, fixturing, and machine preparation. Chinese suppliers often charge $50–$200 per setup, depending on part complexity. For low volumes, setup can dominate per-part cost.

3. Labor and Machine Hourly Rates

Labor rates in China average $5–$15 per hour. Machine rates vary: 3-axis CNC mills at $20–$40/hr, 5-axis at $40–$80/hr. Multiply by estimated machining time to get per-part labor cost.

4. Overhead and Profit

Overhead (facilities, quality control, shipping) typically adds 10–20%. Profit margins range from 10–30%. A reputable supplier will itemize these in their quote.

Step-by-Step Calculator Methodology

  1. Determine part volume – Annual quantity to amortize setup.
  2. Calculate material cost – (Part weight + scrap) × material price per kg.
  3. Estimate machining time – Use CAM software or supplier input. Typical times: simple brackets 5–15 min, complex parts 30–60 min.
  4. Compute labor + machine cost – Machining time × (labor rate + machine rate).
  5. Add setup amortization – Setup cost / batch quantity.
  6. Apply overhead and profit – Sum of above × (1 + overhead% + profit%).
  7. Compare with supplier quotes – The cnc machining cost per part calculator helps validate quotes.
A detailed view of a metalwork workshop showcasing tools, machinery, and steel bars. (Photo: Bram van Egmond / Pexels)

Red Flags to Watch For

  • Extremely low quotes – May indicate hidden costs or poor quality.
  • No breakdown – Avoid suppliers that give only a total price without itemization.
  • Vague lead times – Unclear delivery schedules often signal capacity issues.
  • No quality certifications – ISO 9001 is a minimum; AS9100 for aerospace.

Questions to Ask Suppliers

  • What is your hourly machine rate for 3-axis and 5-axis CNC?
  • Can you provide a cost breakdown: material, setup, labor, overhead?
  • What is your scrap rate and how is it accounted for?
  • Do you offer discounts for higher volumes?
  • What is your typical lead time and shipping cost?

Practical Checklist for Comparing Quotes

FactorSupplier ASupplier BYour Estimate
Material cost per part$1.50$1.80$1.60
Setup amortization$0.50$0.40$0.45
Labor + machine cost$3.00$2.50$2.80
Overhead & profit$0.80$0.70$0.75
Total per part$5.80$5.40$5.60

Use this table to identify discrepancies. For example, if Supplier A's material cost is much higher, ask why. Our directory's observed range of $2.8–$12 aligns with typical bracket parts.

FAQ

Q: How accurate is a cnc machining cost per part calculator?
A: Accuracy depends on input quality. With precise material costs and machining times, you can achieve ±15% accuracy. Always validate with a supplier quote.

Q: What is the typical setup cost for a simple bracket?
A: For parts like an Automotive Control Arm Bracket, setup ranges $50–$100. Complex parts may cost $150–$200.

Q: How can I reduce per-part cost?
A: Increase batch size, simplify design (reduce tight tolerances), or choose a standard material. Our suppliers offer volume discounts.

Ready to source from verified suppliers? Get free quotes and compare offers within 24 hours.

Frequently Asked Questions

How accurate is a cnc machining cost per part calculator?

Accuracy depends on input quality. With precise material costs and machining times, you can achieve ±15% accuracy. Always validate with a supplier quote.

What is the typical setup cost for a simple bracket?

For parts like an Automotive Control Arm Bracket, setup ranges $50–$100. Complex parts may cost $150–$200.

How can I reduce per-part cost?

Increase batch size, simplify design (reduce tight tolerances), or choose a standard material. Our suppliers offer volume discounts.

Ready to Get Your CNC Parts Made in China

Get matched with verified suppliers who can meet your exact specifications.

Get Free Quotes
基本 文件 流程 错误 SQL 调试
  1. 请求信息 : 2026-08-12 16:24:02 HTTP/2.0 GET : https://cnc-parts-china.com/guides/how-to-calculate-cnc-machining-cost-per-part-a-buyers-guide-to-accurate-quoting
  2. 运行时间 : 0.104522s [ 吞吐率:9.57req/s ] 内存消耗:5,209.81kb 文件加载:153
  3. 缓存信息 : 0 reads,0 writes
  4. 会话信息 : SESSION_ID=2b6192a0e900bb56b3cbfdd8454f9abf
  1. /www/wwwroot/www.cnc-parts-china.com/public/index.php ( 0.79 KB )
  2. /www/wwwroot/www.cnc-parts-china.com/vendor/autoload.php ( 0.75 KB )
  3. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/autoload_real.php ( 1.63 KB )
  4. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/platform_check.php ( 0.90 KB )
  5. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/ClassLoader.php ( 15.99 KB )
  6. /www/wwwroot/www.cnc-parts-china.com/vendor/composer/autoload_static.php ( 6.03 KB )
  7. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper.php ( 8.34 KB )
  8. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-validate/src/helper.php ( 2.19 KB )
  9. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/helper.php ( 1.47 KB )
  10. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/stubs/load_stubs.php ( 0.16 KB )
  11. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Exception.php ( 1.69 KB )
  12. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-container/src/Facade.php ( 2.71 KB )
  13. /www/wwwroot/www.cnc-parts-china.com/vendor/ralouphie/getallheaders/src/getallheaders.php ( 1.60 KB )
  14. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/polyfill-mbstring/bootstrap.php ( 8.26 KB )
  15. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/polyfill-mbstring/bootstrap80.php ( 9.78 KB )
  16. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/var-dumper/Resources/functions/dump.php ( 0.99 KB )
  17. /www/wwwroot/www.cnc-parts-china.com/vendor/ezyang/htmlpurifier/library/HTMLPurifier.composer.php ( 0.10 KB )
  18. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-dumper/src/helper.php ( 0.18 KB )
  19. /www/wwwroot/www.cnc-parts-china.com/vendor/symfony/var-dumper/VarDumper.php ( 3.73 KB )
  20. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/App.php ( 15.30 KB )
  21. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-container/src/Container.php ( 15.76 KB )
  22. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/container/src/ContainerInterface.php ( 1.02 KB )
  23. /www/wwwroot/www.cnc-parts-china.com/app/provider.php ( 0.19 KB )
  24. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Http.php ( 6.22 KB )
  25. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper/Str.php ( 7.29 KB )
  26. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Env.php ( 4.68 KB )
  27. /www/wwwroot/www.cnc-parts-china.com/app/common.php ( 0.90 KB )
  28. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/helper.php ( 18.77 KB )
  29. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Config.php ( 5.93 KB )
  30. /www/wwwroot/www.cnc-parts-china.com/config/app.php ( 0.95 KB )
  31. /www/wwwroot/www.cnc-parts-china.com/config/cache.php ( 0.78 KB )
  32. /www/wwwroot/www.cnc-parts-china.com/config/console.php ( 1.07 KB )
  33. /www/wwwroot/www.cnc-parts-china.com/config/cookie.php ( 0.56 KB )
  34. /www/wwwroot/www.cnc-parts-china.com/config/database.php ( 2.13 KB )
  35. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Env.php ( 1.67 KB )
  36. /www/wwwroot/www.cnc-parts-china.com/config/filesystem.php ( 0.61 KB )
  37. /www/wwwroot/www.cnc-parts-china.com/config/lang.php ( 0.91 KB )
  38. /www/wwwroot/www.cnc-parts-china.com/config/log.php ( 1.35 KB )
  39. /www/wwwroot/www.cnc-parts-china.com/config/middleware.php ( 0.19 KB )
  40. /www/wwwroot/www.cnc-parts-china.com/config/route.php ( 2.27 KB )
  41. /www/wwwroot/www.cnc-parts-china.com/config/session.php ( 0.69 KB )
  42. /www/wwwroot/www.cnc-parts-china.com/config/trace.php ( 0.34 KB )
  43. /www/wwwroot/www.cnc-parts-china.com/config/view.php ( 0.82 KB )
  44. /www/wwwroot/www.cnc-parts-china.com/app/event.php ( 0.25 KB )
  45. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Event.php ( 7.77 KB )
  46. /www/wwwroot/www.cnc-parts-china.com/app/service.php ( 0.13 KB )
  47. /www/wwwroot/www.cnc-parts-china.com/app/AppService.php ( 0.26 KB )
  48. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Service.php ( 1.64 KB )
  49. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Lang.php ( 7.35 KB )
  50. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/lang/zh-cn.php ( 13.70 KB )
  51. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/Error.php ( 3.31 KB )
  52. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/RegisterService.php ( 1.33 KB )
  53. /www/wwwroot/www.cnc-parts-china.com/vendor/services.php ( 0.15 KB )
  54. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/PaginatorService.php ( 1.52 KB )
  55. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/ValidateService.php ( 0.99 KB )
  56. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/service/ModelService.php ( 2.04 KB )
  57. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/Service.php ( 0.77 KB )
  58. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Middleware.php ( 6.72 KB )
  59. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/initializer/BootService.php ( 0.77 KB )
  60. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/Paginator.php ( 11.86 KB )
  61. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-validate/src/Validate.php ( 63.20 KB )
  62. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/Model.php ( 23.55 KB )
  63. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/contract/Arrayable.php ( 0.09 KB )
  64. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/contract/Jsonable.php ( 0.13 KB )
  65. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/contract/Modelable.php ( 0.09 KB )
  66. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/Attribute.php ( 21.05 KB )
  67. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/AutoWriteData.php ( 4.20 KB )
  68. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/Conversion.php ( 6.75 KB )
  69. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/DbConnect.php ( 5.16 KB )
  70. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/ModelEvent.php ( 2.33 KB )
  71. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/model/concern/RelationShip.php ( 28.30 KB )
  72. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Db.php ( 2.88 KB )
  73. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/DbManager.php ( 8.52 KB )
  74. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Log.php ( 6.28 KB )
  75. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Manager.php ( 3.92 KB )
  76. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/log/src/LoggerInterface.php ( 2.71 KB )
  77. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/log/src/LoggerTrait.php ( 2.69 KB )
  78. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Cache.php ( 4.92 KB )
  79. /www/wwwroot/www.cnc-parts-china.com/vendor/psr/simple-cache/src/CacheInterface.php ( 4.71 KB )
  80. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/helper/Arr.php ( 17.45 KB )
  81. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/cache/driver/File.php ( 7.84 KB )
  82. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/cache/Driver.php ( 9.02 KB )
  83. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/CacheHandlerInterface.php ( 1.99 KB )
  84. /www/wwwroot/www.cnc-parts-china.com/app/Request.php ( 0.09 KB )
  85. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Request.php ( 54.64 KB )
  86. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/UrlHandler.php ( 6.05 KB )
  87. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/DomainHandler.php ( 5.49 KB )
  88. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/traits/HttpMethodHandler.php ( 4.74 KB )
  89. /www/wwwroot/www.cnc-parts-china.com/app/middleware.php ( 0.30 KB )
  90. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Pipeline.php ( 2.61 KB )
  91. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/TraceDebug.php ( 3.40 KB )
  92. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/middleware/SessionInit.php ( 1.94 KB )
  93. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Session.php ( 1.80 KB )
  94. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/session/driver/File.php ( 6.27 KB )
  95. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/SessionHandlerInterface.php ( 0.87 KB )
  96. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/session/Store.php ( 7.12 KB )
  97. /www/wwwroot/www.cnc-parts-china.com/app/middleware/InstallCheck.php ( 0.82 KB )
  98. /www/wwwroot/www.cnc-parts-china.com/app/middleware/Maintenance.php ( 1.64 KB )
  99. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/facade/Db.php ( 0.93 KB )
  100. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/connector/Mysql.php ( 5.73 KB )
  101. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/PDOConnection.php ( 53.74 KB )
  102. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Connection.php ( 8.39 KB )
  103. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/ConnectionInterface.php ( 4.57 KB )
  104. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/builder/Mysql.php ( 16.58 KB )
  105. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Builder.php ( 24.07 KB )
  106. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/BaseBuilder.php ( 27.50 KB )
  107. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Query.php ( 15.97 KB )
  108. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/BaseQuery.php ( 45.13 KB )
  109. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/TimeFieldQuery.php ( 7.43 KB )
  110. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/AggregateQuery.php ( 3.26 KB )
  111. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ModelRelationQuery.php ( 20.07 KB )
  112. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ParamsBind.php ( 3.66 KB )
  113. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/ResultOperation.php ( 7.01 KB )
  114. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/WhereQuery.php ( 19.37 KB )
  115. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/JoinAndViewQuery.php ( 7.11 KB )
  116. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/TableFieldInfo.php ( 2.63 KB )
  117. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/concern/Transaction.php ( 2.77 KB )
  118. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/log/driver/File.php ( 6.10 KB )
  119. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/LogHandlerInterface.php ( 0.86 KB )
  120. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/log/Channel.php ( 3.89 KB )
  121. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/event/LogRecord.php ( 1.02 KB )
  122. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Route.php ( 23.73 KB )
  123. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleName.php ( 5.74 KB )
  124. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Domain.php ( 2.53 KB )
  125. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleGroup.php ( 22.41 KB )
  126. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Rule.php ( 27.49 KB )
  127. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/RuleItem.php ( 9.78 KB )
  128. /www/wwwroot/www.cnc-parts-china.com/route/admin.php ( 11.49 KB )
  129. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Route.php ( 4.70 KB )
  130. /www/wwwroot/www.cnc-parts-china.com/route/app.php ( 3.73 KB )
  131. /www/wwwroot/www.cnc-parts-china.com/route/install.php ( 0.59 KB )
  132. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/dispatch/Controller.php ( 4.74 KB )
  133. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/route/Dispatch.php ( 11.32 KB )
  134. /www/wwwroot/www.cnc-parts-china.com/app/controller/content/Guide.php ( 1.71 KB )
  135. /www/wwwroot/www.cnc-parts-china.com/app/controller/front/BaseFrontController.php ( 70.19 KB )
  136. /www/wwwroot/www.cnc-parts-china.com/app/BaseController.php ( 6.06 KB )
  137. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/View.php ( 1.70 KB )
  138. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Config.php ( 1.37 KB )
  139. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/View.php ( 4.39 KB )
  140. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/facade/Session.php ( 1.79 KB )
  141. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-helper/src/Collection.php ( 16.47 KB )
  142. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Express.php ( 1.53 KB )
  143. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-orm/src/db/Raw.php ( 1.30 KB )
  144. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Response.php ( 9.07 KB )
  145. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/response/View.php ( 3.29 KB )
  146. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/Cookie.php ( 6.06 KB )
  147. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-view/src/Think.php ( 8.38 KB )
  148. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/framework/src/think/contract/TemplateHandlerInterface.php ( 1.60 KB )
  149. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/Template.php ( 46.61 KB )
  150. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/template/driver/File.php ( 2.41 KB )
  151. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-template/src/template/contract/DriverInterface.php ( 0.86 KB )
  152. /www/wwwroot/www.cnc-parts-china.com/runtime/temp/7ca10c289ae36b7629e662dcf2e3aff0.php ( 14.04 KB )
  153. /www/wwwroot/www.cnc-parts-china.com/vendor/topthink/think-trace/src/Html.php ( 4.42 KB )
  1. CONNECT:[ UseTime:0.000632s ] mysql:host=127.0.0.1;port=3306;dbname=cncpartsch;charset=utf8mb4
  2. SHOW FULL COLUMNS FROM `kt_system_config` [ RunTime:0.001387s ]
  3. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'maintenance_mode' LIMIT 1 [ RunTime:0.000558s ]
  4. SHOW TABLES LIKE 'kt_site' [ RunTime:0.001503s ]
  5. SHOW FULL COLUMNS FROM `kt_site` [ RunTime:0.001754s ]
  6. SELECT `favicon` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000606s ]
  7. SHOW TABLES LIKE 'kt_system_config' [ RunTime:0.001036s ]
  8. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'site_favicon' LIMIT 1 [ RunTime:0.000554s ]
  9. SELECT `logo` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000259s ]
  10. SELECT `config_value` FROM `kt_system_config` WHERE `config_key` = 'site_logo' LIMIT 1 [ RunTime:0.000293s ]
  11. SELECT `name` FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000327s ]
  12. SELECT * FROM `kt_site` ORDER BY `id` ASC LIMIT 1 [ RunTime:0.000423s ]
  13. SELECT `config_value`,`config_key` FROM `kt_system_config` WHERE `config_key` IN ('site_name','site_domain','site_subtitle','site_description','site_logo','site_favicon','site_keywords','seo_home_title','seo_home_description','seo_home_keywords','contact_phone','contact_wechat','icp_code') [ RunTime:0.000478s ]
  14. SHOW FULL COLUMNS FROM `kt_category` [ RunTime:0.001428s ]
  15. SHOW COLUMNS FROM `kt_category` [ RunTime:0.001157s ]
  16. SELECT * FROM `kt_category` WHERE `parent_id` = 0 AND `site_id` = 1 AND `status` = 1 ORDER BY `sort` DESC,`id` ASC LIMIT 5 [ RunTime:0.000807s ]
  17. SHOW FULL COLUMNS FROM `kt_news` [ RunTime:0.001456s ]
  18. SELECT * FROM `kt_news` WHERE `site_id` = 1 AND `slug` = 'how-to-calculate-cnc-machining-cost-per-part-a-buyers-guide-to-accurate-quoting' AND `content_type` = 'buying_guide' AND `publish_status` = 'published' LIMIT 1 [ RunTime:0.000663s ]
  19. UPDATE `kt_news` SET `views` = `views` + 1 WHERE `id` = 164 [ RunTime:0.002261s ]
  20. SHOW FULL COLUMNS FROM `kt_news_data` [ RunTime:0.001278s ]
  21. SELECT * FROM `kt_news_data` WHERE `news_id` = 164 LIMIT 1 [ RunTime:0.000469s ]
  22. SELECT * FROM `kt_news` WHERE `site_id` = 1 AND `publish_status` = 'published' AND `category_id` = 80 AND `id` <> 164 AND `content_type` IN ('article','buying_guide','comparison','case_study') ORDER BY content_type = 'buying_guide' DESC,`id` DESC LIMIT 8 [ RunTime:0.001063s ]
0.117151s